کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
477846 1446205 2007 14 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
The new Fundamental Tree Algorithm for production scheduling of open pit mines
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
The new Fundamental Tree Algorithm for production scheduling of open pit mines
چکیده انگلیسی

The problem of annual production scheduling in surface mining consists of determining an optimal sequence of extracting the mineralized material from the ground. The main objective of the optimization process is usually to maximize the total Net Present Value of the operation. Production scheduling is typically a mixed integer programming (MIP) type problem. However, the large number of integer variables required in formulating the problem makes it impossible to solve. To overcome this obstacle, a new algorithm termed “Fundamental Tree Algorithm” is developed based on linear programming to aggregate blocks of material and decrease the number of integer variables and the number of constraints required within the MIP formulation. This paper proposes the new Fundamental Tree Algorithm in optimizing production scheduling in surface mining. A case study on a large copper deposit summarized in the paper shows substantial economic benefit of the proposed algorithm compared to existing methods.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 177, Issue 2, 1 March 2007, Pages 1153–1166
نویسندگان
,