کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
477940 1446220 2006 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Minimizing weighted earliness–tardiness and due-date cost with unit processing-time jobs
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Minimizing weighted earliness–tardiness and due-date cost with unit processing-time jobs
چکیده انگلیسی

The classical single-machine scheduling and due-date assignment problem of Panwalker et al. [Panwalker, S.S., Smith, M.L., Seidmann, A., 1982. Common due date assignment to minimize total penalty for the one machine scheduling problem. Operations Research 30(2) (1982) 391–399] is the following: All n jobs share a common due-date, which is to be determined. Jobs completed prior to or after the due-date are penalized according to a cost function which is linear and job-independent. The objective is to minimize the total earliness–tardiness and due-date cost. We study a generalized version of this problem in which: (i) the earliness and tardiness costs are allowed to be job dependent and asymmetric and (ii) jobs are processed on parallel identical machines. We focus on the case of unit processing-time jobs. The problem is shown to be solved in polynomial (O(n4)) time. Then we study the special case with no due-date cost (a classical problem known in the literature as TWET). We introduce an O(n3) solution for this case. Finally, we study the minmax version of the problem, (i.e., the objective is to minimize the largest cost incurred by any of the jobs), which is shown to be solved in polynomial time as well.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 172, Issue 2, 16 July 2006, Pages 528–544
نویسندگان
, ,