کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
479048 | 1446188 | 2007 | 15 صفحه PDF | دانلود رایگان |
The paper considers scheduling of inspections for imperfect production processes where the process shift time from an ‘in-control’ state to an ‘out-of-control’ state is assumed to follow an arbitrary probability distribution with an increasing failure (hazard) rate and the products are sold with a free repair warranty (FRW) contract. During each production run, the process is monitored through inspections to assess its state. If at any inspection the process is found in ‘out-of-control’ state, then restoration is performed. The model is formulated under two different inspection policies: (i) no action is taken during a production run unless the system is discovered in an ‘out-of-control’ state by inspection and (ii) preventive repair action is undertaken once the ‘in-control’ state of the process is detected by inspection. The expected sum of pre-sale and post-sale costs per unit item is taken as a criterion of optimality. We propose a computational algorithm to determine the optimal inspection policy numerically, as it is quite hard to derive analytically. To ease the computational difficulties, we further employ an approximate method which determines a suboptimal inspection policy. A comparison between the optimal and suboptimal inspection policies is made and the impact of FRW on the optimal inspection policy is investigated in a numerical example.
Journal: European Journal of Operational Research - Volume 183, Issue 1, 16 November 2007, Pages 238–252