کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
479166 1446202 2007 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
چکیده انگلیسی

This paper presents a priority rule-based heuristic for the multi-mode resource-constrained project scheduling problem with the splitting of activities around unavailable resources allowed. All resources considered are renewable and each resource unit may not be available at all times due to resource vacations, which are known in advance. A new concept called moving resource strength is developed to help identify project situations where activity splitting is likely to be beneficial during scheduling. The moving resource strength concept is implemented in priority rule-based heuristics to control activity splitting when scheduling. Multiple comparisons of the performance of combination of activity–mode priority rules used in the heuristics are provided. Computational experiments demonstrate the effectiveness of the heuristic in reducing project makespan, and minimizing activity splitting.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 178, Issue 2, 16 April 2007, Pages 374–390
نویسندگان
, ,