کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
481500 1446145 2009 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
چکیده انگلیسی

We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order to contribute to closing this gap to reality, we generalise the multi-project scheduling problem by additionally including sequence- and resource-dependent transfer times, which represent setup activities necessary when a resource is removed from one project and reassigned to another (or from one job to another within the same project). In this paper, we define the modified resource constrained multi-project scheduling problem with transfer times (called RCMPSPTT), which aims at minimising the multi-project duration for the single-project approach or the mean project duration for the multi-project approach. We formulate both perspectives as an integer linear program, propose priority rule based solution procedures and present results of comprehensive computational experiments. Provided that the combination of scheduling scheme and priority rules is chosen appropriately, the procedures obtain good results. In particular, resource oriented priority rules are identified to be successful.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 197, Issue 2, 1 September 2009, Pages 492–508
نویسندگان
, ,