کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
481732 1446158 2009 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Project selection, scheduling and resource allocation with time dependent returns
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Project selection, scheduling and resource allocation with time dependent returns
چکیده انگلیسی

In this paper we formulate and analyze the joint problem of project selection and task scheduling. We study the situation where a manager has many alternative projects to pursue such as developing new product platforms or technologies, incremental product upgrades, or continuing education of human resources. Project return is assumed to be a known function of project completion time. Resources are limited and renewable. The objective is to maximize present worth of profit. A general mathematical formulation that can address several versions of the problem is presented. An implicit enumeration procedure is then developed and tested to provide good solutions based on project ordering and a prioritization rule for resource allocation. The algorithm uses an imbedded module for solving the resource-constrained project scheduling problem at each stage. The importance of integrating the impact of resource constraints into the selection of projects is demonstrated.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 193, Issue 1, 16 February 2009, Pages 23–34
نویسندگان
, ,