کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
482517 1446143 2009 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Discrete time model and algorithms for container yard crane scheduling
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Discrete time model and algorithms for container yard crane scheduling
چکیده انگلیسی

Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. PM (prime mover) queues in front of the YCs are common. Hence, efficient YC scheduling to reduce the PM waiting time is critical in increasing a CT’s throughput. We develop an efficient model for YC scheduling by taking into account realistic operational constraints such as inter-crane interference, fixed YC separation distances and simultaneous container storage/retrievals. Among them, only inter-crane interference has ever been considered in the literature. The model requires far fewer integer variables than the literature by using bi-index decision variables. We show how the model can be solved quickly using heuristics and rolling-horizon algorithm, yielding close to optimal solutions in seconds. The solution quality and solution time are both better than the literature even with additional constraints considered. The proposed formulations and algorithms can be extended to other problems with time windows and space constraints.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 198, Issue 1, 1 October 2009, Pages 165–172
نویسندگان
, , , , ,