کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4922987 1430616 2014 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
The Minimum Yellow Timing for Ramp Meters
ترجمه فارسی عنوان
حداقل زمان زرد برای رمپ متر
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
چکیده انگلیسی

ABSTRACTThe minimum Yellow timing is an important timing factor that affects metering rate for multiple-vehicle-per-green, such as two-vehicle-per-green, type of operations. In review of the current ramp meter timing practices, it was found that the minimum Yellow timing does not consider the dilemma zone issue for the approaching motorists, and therefore may lead to red-light running. An analytic framework was developed to determine the minimum Yellow timing by integrating the ramp meter timing logic and dilemma zone removal practices. Factors such as roadway geometry, driver and vehicle characteristics, and detector layout are considered. For two-vehicle-per-green type of operations, an evaluation indicated that the minimum Yellow should be timed around 3.6 seconds to consider the situation when the 2nd vehicle is approaching. Such a long but necessary minimum Yellow timing will increase the minimum cycle length to about 7.7 seconds and hence reduce the release capacity by about 10%.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Transportation Science and Technology - Volume 3, Issue 4, 1 December 2014, Pages 365-377
نویسندگان
, , , , , , , ,