کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
5011239 | 1462475 | 2017 | 10 صفحه PDF | دانلود رایگان |
This work applies the method of energy and exergy analysis over first step of linear alkyl benzene (LAB) production namely kerosene pre fraction plant, to determine unit energy and exergy performance and loss, besides of opportunities for improvement based on operational data. For this purpose macroscopic energy and exergy balance was developed over main equipment including electro pumps, heat exchangers, air coolers, and distillation columns. The results shows that total energy performance of plant is 92.62% by 19.76Â MW energy lost, while from exergy perspective, unit performance is 78.08% by 17.92Â MW exergy lost. Maximum local exergy lost occurs in the feed pre heater exchanger by 27% performance which is designed to recover energy from top product of second column, furthermore results shows that upgrading low quality energy in air coolers based on heat pump concept would protect energy and exergy emission to the environment and reduce 40% of total lost energy and 16% of total lost exergy in plant.
Journal: Case Studies in Thermal Engineering - Volume 10, September 2017, Pages 413-422