کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5079297 1477529 2016 29 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Optimal imperfect maintenance strategy for leased equipment
ترجمه فارسی عنوان
استراتژی ناکارآمد بهینه سازی برای تجهیزات اجاره ای
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
چکیده انگلیسی
This paper presents a preventive maintenance (PM) policy for leased equipment over a finite lease period L. Maintenance is entrusted to the lessor. The purpose is to determine the PM period T minimizing the expected total cost over the lease period in a context where repairs and PM actions are imperfect and have non-negligible durations. The leased equipment is periodically subjected to imperfect PM restoring it to the state 'as good as new' with probability p and keeping it at state 'as bad as old' with probability q. In case of failures between successive PM actions, imperfect repairs are performed with a given efficiency following a decreasing quasi-renewal process. Besides the maintenance costs, the lessor may incur a penalty cost if the total expected equipment downtime due to repair and PM during the lease period exceeds a pre-specified threshold. A mathematical model and a numerical algorithm are developed to find the optimal maintenance strategy T* over the lease period for any given set of input parameters (equipment reliability, the lease period length, the repair and PM efficiency levels, and the maintenance and penalty costs). A numerical example is presented and the obtained results are discussed.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 178, August 2016, Pages 57-64
نویسندگان
, , ,