کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5081632 1477607 2010 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times
چکیده انگلیسی
In this paper we address the general multi-period production/inventory problem with non-stationary stochastic demand and supplier lead-time under service level constraints. A replenishment cycle policy (Rn,Sn) is modeled, where Rn is the nth replenishment cycle length and Sn is the respective order-up-to-level. We propose a stochastic constraint programming approach for computing the optimal policy parameters. In order to do so, a dedicated global chance-constraint and the respective filtering algorithm that enforce the required service level are presented. Our numerical examples show that a stochastic supplier lead-time significantly affects policy parameters with respect to the case in which the lead-time is assumed to be deterministic or absent.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 127, Issue 1, September 2010, Pages 180-189
نویسندگان
, , , ,