کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5081905 1477620 2009 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Dynamic lot sizing problem with continuous-time Markovian production cost
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Dynamic lot sizing problem with continuous-time Markovian production cost
چکیده انگلیسی
This paper develops a polynomial algorithm for obtaining dynamic economic lot sizes in a single product multiperiod production system with the objective of minimizing total production and inventory costs over T periods. It is assumed that production costs are linear, inventory costs are concave, setup costs are zero and backlogging is not permitted in all periods. Moreover, the unit production cost is a stochastic variable, which is evolved according to a continuous-time Markov process over the planning horizon. The model is formulated as a stochastic dynamic programming (DP) optimization with the state variable being unit production cost. Then, it is solved using the backward dynamic programming approach. To justify the application of the proposed model, two practical cases are presented.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 120, Issue 2, August 2009, Pages 607-612
نویسندگان
, , ,