کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
5082418 | 1477636 | 2008 | 9 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Simulating an agile, synchronized manufacturing system
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
چکیده انگلیسی
Retail customers are demanding more variety, more features and quicker order response times from manufacturers. Furniture production systems have had to become more flexible to respond to the variety of styles, fabrics and patterns offered by retailers. In this make-to-order environment, the orders received must be grouped into specific, logical batches whose short-cycle operations require close coordination and monitoring throughout the facility. For upholstered furniture, each batch may be unique because it consolidates orders having fabrics of different colors, texture or style. In recliner chair and similar production systems, the parallel component subassembly lines must maintain synchronization within each line and between the lines for components to simultaneously reach final assembly. The simulation developed represents an existing production system. It generates expected outputs under conditions of operation variability, queue lengths (buffers) and batch changeover (set-up) times over a range of 3 uniform and feasible batch sizes. Thus, the real-time status and location of components and subassemblies consigned to a specific production batch is essential for maintaining and improving quality and utilization of personnel, space, material and other resources.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 112, Issue 2, April 2008, Pages 714-722
Journal: International Journal of Production Economics - Volume 112, Issue 2, April 2008, Pages 714-722
نویسندگان
John G.H. Carlson, Andrew C. Yao,