Throughput maximization in serial production lines with worksharing
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
In the traditional serial line model, tasks are assigned to unique workstations. We consider the case of partially cross-trained workers where some tasks may be performed at either of a pair of adjacent workstations. We investigate dynamic decision rules for guiding the operators' decision regarding when to complete the shared tasks and when to pass a unit along to the next workstation. The objective is to maximize throughput in constant work-in-process systems with low levels of work in process. A simple rule based on a buffer threshold level is shown to be nearly optimal for the two-stage line. Extensions to longer lines are provided and we show that myopic strategies that only consider adjacent workstations continue to perform well.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 99, Issues 1â2, JanuaryâFebruary 2006, Pages 88-101
Journal: International Journal of Production Economics - Volume 99, Issues 1â2, JanuaryâFebruary 2006, Pages 88-101
نویسندگان
Jiaqiong Chen, Ronald G. Askin,