کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
5446333 | 1511131 | 2016 | 5 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Cascade Utilization of Flue Gas Waste Heat in Combined Heat and Power System with high Back-pressure (CHP-HBP)
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
انرژی (عمومی)
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
In this study, the cascade utilization of the flue gas waste heat in CHP-HBP was performed. In the proposed system, flue gas of the coal-fired boiler and exhaust steam of the turbine were recovered synthetically. The maximum heat-supply capacity and the thermodynamic performance of the full heating period was analyzed. The results showed that: in the novel system, the maximum heat-supply capacity is 22.51 MW higher than that of reference system, and the coal consumption rate is reduced by 10.91g/kWh. Meanwhile, during the whole heating period, the gross electric power is 7.37 million kWh higher than the reference system.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Procedia - Volume 104, December 2016, Pages 27-31
Journal: Energy Procedia - Volume 104, December 2016, Pages 27-31
نویسندگان
Shifei Zhao, Xiaoze Du, Zhihua Ge, Yongping Yang,