کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
678275 888638 2009 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Analyzing and estimating delays in wood chipping operations
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی تکنولوژی و شیمی فرآیندی
پیش نمایش صفحه اول مقاله
Analyzing and estimating delays in wood chipping operations
چکیده انگلیسی

Productivity studies are still frequently used to describe, understand and improve forest operations. Delays are recognized as being one of the major factors that limit chipper productivity in most operations and are therefore an integral part of most time studies. Accurately recording and subsequently interpreting delay events is within the relatively short observation period of a typical time and motion study. This paper analyzes the delay component of sixty-three chipper time-study data sets, from thirty-six different chipping machines. All the studies were set up and carried out with the same principal investigator. Three delays' categories were used; mechanical, operator and organizational and other. The overall average utilization of the chipper was 73.8%. Regardless of operation type, two thirds of the total delay time are represented by organizational delays, which emphasizes the crucial role of operation management. Optimization measures should not be limited to the individual machine, but address the operation as a whole. The more productive the operation, the more sensitive it is to both delays as well as poor planning.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Biomass and Bioenergy - Volume 33, Issue 3, March 2009, Pages 429–433
نویسندگان
, ,