کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
706740 891635 2010 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
The Aftermath of Primary Power and Its Implications for Independent Transmission in PJM
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
The Aftermath of Primary Power and Its Implications for Independent Transmission in PJM
چکیده انگلیسی

The recent decision by the Federal Energy Regulatory Commission in “Primary Power” will have fundamental ramifications for transmission investment in the far-reaching PJM footprint. This decision, which is pending on rehearing and will likely be appealed, will determine whether transmission projects that are entitled to regulated rate recovery under the PJM tariff can only be built by incumbent transmission owners and whether new independent transmission entities are limited to building transmission projects on a “merchant” basis.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: The Electricity Journal - Volume 23, Issue 7, August–September 2010, Pages 16–32
نویسندگان
, ,