کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
714167 892180 2013 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A Resource Constrained Project Scheduling Problem with Bounded Multitasking
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
A Resource Constrained Project Scheduling Problem with Bounded Multitasking
چکیده انگلیسی

The Resource Constrained Project Scheduling Problem (RCPSP) is the sub-class of the Scheduling Problem that deals with scenarios where personnel or workforce employed to perform the tasks are limited and each job has an arrival time, a due date, and a penalty associated to delays. In this article, we consider a special case of the RCPSP, which we will denote as the Resource Constrained Project Scheduling Problem with Bounded Multitasking (RCPSPBM), where human analysts are able to perform a limited number of tasks in parallel in exchange for cognitive overhead costs. We present a description of the problem and introduce an exact Mixed-Integer Linear Program formulation of the (RCPSPBM), used to evaluate the efficiency of (typically online) algorithms employed by dispatchers.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: IFAC Proceedings Volumes - Volume 46, Issue 24, September 2013, Pages 433-437