کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
714209 892182 2012 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Using max-plus to solve the job shop problem with time lags
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
Using max-plus to solve the job shop problem with time lags
چکیده انگلیسی

We consider a job shop problem with minimum and maximum time lags (JSPTL). The scheduling method is based on potential inequalities and disjunctive constraints, that are formulated in the max-plus algebra, in terms of inequalities. The computation of the eigenvalue of the corresponding matrices provides bounds, and a feasibility test that is used in a branch-and- bound procedure that permits to solve the problem. Effective computations make use of the max-plus Scicoslab toolbox, and its implementation of the Howard algorithm. One can evaluate whether or not a solution exists to the problem, compute one solution, or compute the set of solutions minimizing the completion time. The method is applied to two case studies from the literature, which permit to point out its advantages and drawbacks.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: IFAC Proceedings Volumes - Volume 45, Issue 29, 2012, Pages 67-72