کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
722144 892324 2009 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Preemptive Parallel Processor Scheduling with Distinct Due Windows and Min-Max Criterion
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
Preemptive Parallel Processor Scheduling with Distinct Due Windows and Min-Max Criterion
چکیده انگلیسی

Problem of scheduling n preemptive jobs on m identical parallel processors is studied, in which for each job a distinct due window is given in advance and an integer release date is specified. If a job is completed within its due window, then it incurs no penalty. Otherwise, it incurs a job-dependent earliness or tardiness cost. The objective is to find a job schedule such that a maximum of job-dependent costs associated with earliness, tardiness and a time a job is in process is minimized. It is proved that optimal solutions to this problem can be found by a solving a polynomial number of instances of classical maximum flow problem.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: IFAC Proceedings Volumes - Volume 42, Issue 13, 2009, Pages 234-237