کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
723830 892354 2006 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
ACHIEVING REDUCED CYCLE TIMES IN SEMICONDUCTOR MANUFACTURING VIA EFFECTIVE CONTROL OF THE P-K EQUATION FACTORS
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
ACHIEVING REDUCED CYCLE TIMES IN SEMICONDUCTOR MANUFACTURING VIA EFFECTIVE CONTROL OF THE P-K EQUATION FACTORS
چکیده انگلیسی

In the current environment of flash semiconductor market, competitive cycle times are the key to success. Cycle Time (CT) reduction can be achieved by process time elimination and/or equipment performance improvement, but also by optimizing on the WIP management policy. In this paper, we discuss how significant CT reductions are attained via the effective change of parameter values of the governing WIP management policy of a semiconductor factory. A full factorial Design of Experiments (DOE) was performed, and several parameters were examined. The impact on the coefficient of variability of departure rate (CDR) and CT was evaluated. Results have clearly shown that by changing the values of these parameters, significant cycle time reductions can be achieved.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: IFAC Proceedings Volumes - Volume 39, Issue 3, 2006, Pages 65-69