کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
7355362 1477510 2017 35 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Scheduling of truck arrivals, truck departures and shop-floor operation in a cross-dock platform, based on trucks loading plans
ترجمه فارسی عنوان
برنامه ریزی ورود کامیون ها، خروجی های کامیون و عملیات فروشگاه در یک اسکله متقابل، براساس برنامه بارگذاری کامیون
کلمات کلیدی
صنعت خودرو، مدیریت زنجیره تامین، برنامه زمانبندی متقابل، برنامه خطی عدد صحیح مختلط،
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
چکیده انگلیسی
The extended international development of the automotive industry has been supported in a part by crossdocking platforms set up between distant manufacturing plants and nearby first-tier suppliers. A cross-dock centre is an intermediate consolidation point in a supply chain linking a set of suppliers with a set of customers. Main advantages are a reduced lead time, a decrease of stock level and economies in transportation. At shop-floor, packages from inbound trucks are unloaded, moved across, sorted by destination and loaded onto outbound trucks. A case of study at Renault company is presented in this paper. Two important points are observed for this Renault crossdock center: (1) repackaging operations are performed for some products and (2) due to the high diversity of packages' dimensions and stacking rules, scheduling of inbound, repackaging and loading outbound trucks is a complex problem. We propose a mixed integer linear programming model to schedule inbound trucks' arrival times (considering given soft time windows), shop-floor repackaging operations and outbound trucks' departure times. Capacitated temporary storage zones and a capacitated repack workshop are considered at crossdock shop-floor. The model seeks to minimize penalty costs related to inbound trucks' arrival times and consequently unbalanced workload of the repack workshop. Implemented in CPLEX and tested on some instances provided by Renault, results of numerical experiments show the efficiency and pertinence of the model in the given industrial context.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 194, December 2017, Pages 102-112
نویسندگان
, , ,