کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
7421582 1482629 2016 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Modifying and applying time and cost blocks: The case of E-Da theme park, Kaohsiung, Taiwan
موضوعات مرتبط
علوم انسانی و اجتماعی مدیریت، کسب و کار و حسابداری استراتژی و مدیریت استراتژیک
پیش نمایش صفحه اول مقاله
Modifying and applying time and cost blocks: The case of E-Da theme park, Kaohsiung, Taiwan
چکیده انگلیسی
The main purpose of this study is to modify and apply a management tool called time and cost blocks (TCB). The model was modified to adjust how the “benefit indicator” was measured and further enhanced by inclusion of visitor satisfaction scores and revisiting intention. Data collection was accomplished by means of a diary-type semi-structured questionnaire, which was administered in face-to-face interviews with 655 visitors of the E-Da World theme park in Kaohsiung, Taiwan. The results indicate that participation intensity (PI) and benefit indicator (BI) have a significant relationship with satisfaction and revisiting intention.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Tourism Management - Volume 54, June 2016, Pages 34-42
نویسندگان
,