کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
7916722 | 1511093 | 2017 | 6 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Utilization of excess steam through dry steam cycle at Kamojang geothermal power plant
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
انرژی (عمومی)
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
We present the investigation of the electricity generation by utilizing the working fluid from the excess steam at Kamojang geothermal power plant which currently discharged to the atmosphere despite its thermal energy potential due to the vapor-domination of the steam. To produce accurate results, a model validated with real data of Kamojang plant will be employed in this study. Constraint of the model calculation is set based on the regime of allowable condenser pressure and cooling water temperature. Optimization of the system is carried out by investigating the most excellent gas removal system (GRS) of the non-condensable gasses (NCGs) based on real data operation. The GRS configurations will be developed from one-stage and two-stage of both liquid ring vacuum pump (LRVP) and steam ejector, and the hybrid system. We found that a one-stage LRVP is the best GRS among others, while it can produce an electric power of 15.94 MW from the 28.45 kg/s of working fluid. Considering the zero cost of the discharged excess steam, the installation of the plant will support the plant capacity and the surrounding area.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Procedia - Volume 142, December 2017, Pages 160-165
Journal: Energy Procedia - Volume 142, December 2017, Pages 160-165
نویسندگان
Lukman Adi Prananto, Tubagus Muhammad Fauzi Soelaiman, Muhammad Aziz,