کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
802158 1467872 2014 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Optimum inspection and maintenance policies for corroded structures using partially observable Markov decision processes and stochastic, physically based models
ترجمه فارسی عنوان
سیاست های بازرسی و بهینه سازی مطلوب برای ساختارهای خورنده با استفاده از مراحل تصمیم گیری مارکوف و مدل های تصادفی، مبتنی بر فیزیکی
کلمات کلیدی
پروسه تصمیم گیری مارکوف به طور جزئی قابل مشاهده است. کنترل تصادفی، مشاهدات نامعلوم، هزینه زندگی ساختاری، سیاست های بازرسی و نگهداری، مدل خوردگی تصادفی فضایی
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی مکانیک
چکیده انگلیسی


• Stochastic control methods and Bayesian principles can result in POMDPs.
• Modeling and solving POMDP models with large state spaces for structural management.
• Stochastic, physically based models are connected to the control process.
• Infinite and finite horizon cases comparison, with 332 and 14,009 states respectively.
• Elaborate policies with a policy spectrum that is clearly superior to other methods.

Stochastic control methods have a history of implementation in risk management and life-cycle cost procedures for civil engineering structures. The synergy of stochastic control methods and Bayesian principles can result in Partially Observable Markov Decision Processes (POMDPs) that allow consideration of uncertainty within the entire domain of the model and expand available policy options compared to other state-of-the art methods. The superior attributes of POMDPs enable optimum decisions which are based on the belief space or otherwise only on the best knowledge that a decision-maker can have at each time. In this work the effort is mostly based in modeling and solving the problem of finding optimal policies for the maintenance and management of aging structures through a POMDP framework with large state spaces that can adequately and sufficiently describe real-life problems. In order to form the POMDP framework, stochastic, physically based models can be used and their connection to the control process is explained in detail. Specific examples of a corroded existing structure are presented, based on non-stationary POMDPs, for both infinite and finite horizon cases with 332 and 14,009 states respectively. Results from both cases are compared and discussed and the capabilities of the method become apparent.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Probabilistic Engineering Mechanics - Volume 37, July 2014, Pages 93–108
نویسندگان
, ,