کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
816344 | 906439 | 2013 | 7 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
A heuristics-based solution to the continuous berth allocation and crane assignment problem
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی (عمومی)
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
Effective utilization plans for various resources at a container terminal are essential to reducing the turnaround time of cargo vessels. Among the scarcest resources are the berth and its associated cranes. Thus, two important optimization problems arise, which are the berth allocation and quay crane assignment problems. The berth allocation problem deals with the generation of a berth plan, which determines where and when a ship has to berth alongside the quay. The quay crane assignment problem addresses the problem of determining how many and which quay crane(s) will serve each vessel. In this paper, an integrated heuristics-based solution methodology is proposed that tackles both problems simultaneously. The preliminary experimental results show that the proposed approach yields high quality solutions to such an NP-hard problem in a reasonable computational time suggesting its suitability for practical use.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Alexandria Engineering Journal - Volume 52, Issue 4, December 2013, Pages 671-677
Journal: Alexandria Engineering Journal - Volume 52, Issue 4, December 2013, Pages 671-677
نویسندگان
Mohammad Hamdy Elwany, Islam Ali, Yasmine Abouelseoud,