کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
816375 906441 2012 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Installation effects of auger cast-in-place piles
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی (عمومی)
پیش نمایش صفحه اول مقاله
Installation effects of auger cast-in-place piles
چکیده انگلیسی

Since their introduction in Europe and North America some 50 years ago, auger cast-in-place piles (ACIP) have become increasingly popular all over the world. These piles offer considerable environmental advantages during construction including minimal vibration, and low noise beside their high productivity. The most severe limitation of the ACIP is its sensitivity to operator performance, which can lead to a pile of poor integrity or inconsistent quality. Thus the improper use of ACIP equipment can result in piles containing defects or can cause instability of nearby structures. Three case studies are presented and discussed in an effort to illustrate learned lessons. First case study highlights the misuse of ACIP equipment leading to unreliable defective pile foundations. Second and third case studies show the adverse effects of installing ACIP on the stability of nearby structures. The study revealed that it is essential to employ a clever pile crew during the installation of ACIP to observe, interpret, and take corrective actions for unusual situations. The authorities worldwide should oblige pile contractors to employ only experienced and qualified workers in charge of geotechnical engineering works. Tender documents should include precise clauses related to the technological factors affecting the quality of ACIP. Unfavorable side effects of installing ACIP in saturated loose and medium sand can cause tilt of adjacent existing structures; even they are on either shallow or deep foundations. A row of micro-piles and/or soil grouting adjacent to the existing buildings were successfully used to reduce the adverse effects of ACIP. Implementation of different codes on the results of pile loading tests produced different pile working loads. Therefore tender documents should specify the code upon which interpreting the pile test results. At the meantime the geotechnical engineer should implement his experience and judgment during application of the specified code. Finally this work indicates that the outcome prediction of ACIP may deviate from the actual performance.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Alexandria Engineering Journal - Volume 51, Issue 4, December 2012, Pages 281–292
نویسندگان
, ,