کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9725027 1477672 2005 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Timing production in LP models in a rolling schedule
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Timing production in LP models in a rolling schedule
چکیده انگلیسی
We consider an arbitrary supply chain structure under demand uncertainty. We look at a setting where the supply chain planning is executed periodically and where the demand of end items in subsequent periods is stochastic. In contrast to other linear programming-based approaches, we assume constant planned lead times. In this paper we discuss the timing of production during the planned lead times of items. If production starts immediately, the work-in-process inventory costs are higher, but producing later will result in higher safety stocks. We look at the influence of the demand variation, the planned lead time of the items, the utilization rate of resources, and the added value when merging items, on the inventory costs. The results indicate that, for higher utilization rates, producing early is more suitable.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volumes 93–94, 8 January 2005, Pages 319-329
نویسندگان
, , ,