
Keywords: کنترل بیوفولینگ; An; membrane area needed (m2); Aref; membrane area of the referenced municipal MBR installation (m2); CA; energy consumption for compressing the air of full-scale MBR installation (kWh/m3); CIP; energy consumption for unit operations related to membrane a