کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1023446 1483037 2013 14 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty
موضوعات مرتبط
علوم انسانی و اجتماعی مدیریت، کسب و کار و حسابداری کسب و کار و مدیریت بین المللی
پیش نمایش صفحه اول مقاله
Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty
چکیده انگلیسی

In this paper, we study the impact of demand uncertainty on the build-operate-transfer (BOT) contract design by optimizing a bi-objective problem via three critical decisions: toll, capacity and concession period. We derive the optimums and identify the public and private sector’s economic incentives. We find that the optimal length of concession period and the service quality of the infrastructure depend on the two parties’ operational costs and negotiation powers. Under mild conditions, we prove that the government will build a larger capacity but charge less than the private sector. Furthermore, the efficiency of BOT contract is improved with demand uncertainty.


► We consider random and price-sensitive demand in build-operate-transfer (BOT) contracts.
► We derive and characterize the optimal decisions of the private sector and the government.
► The optimal concession period depends on the operational costs and negotiation powers.
► The volume–capacity ratio is increasing in the private sector’s relative negotiation power.
► BOT contracts’ economic efficiency is improved with demand uncertainty.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Transportation Research Part E: Logistics and Transportation Review - Volume 53, July 2013, Pages 1–14
نویسندگان
, ,