کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1024109 941667 2008 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Production scheduling and truck dispatching of ready mixed concrete
موضوعات مرتبط
علوم انسانی و اجتماعی مدیریت، کسب و کار و حسابداری کسب و کار و مدیریت بین المللی
پیش نمایش صفحه اول مقاله
Production scheduling and truck dispatching of ready mixed concrete
چکیده انگلیسی

In this research, we develop an integrated model that combines ready mixed concrete (RMC) production scheduling and truck dispatching in the same framework. The model is formulated as a mixed integer network flow problem with side constraints, which is characterized as NP-hard. To solve realistic problems, we develop a solution method, which incorporates a mathematical programming solver. To evaluate the model and the solution method, numerical tests using real operating data from an RMC firm in Taiwan are performed. The test results show that the model and the solution algorithm would be useful for actual operations.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Transportation Research Part E: Logistics and Transportation Review - Volume 44, Issue 1, January 2008, Pages 164–179
نویسندگان
, , ,