کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
10522986 | 956092 | 2005 | 19 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
A distributed time-driven simulation method for enabling real-time manufacturing shop floor control
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
This paper proposes a distributed simulation approach for scheduling discrete-events in manufacturing shop floors. The proposed approach employs a time-driven method to simulate occurrence of discrete-events using distributed entities that replicate physical entities in the manufacturing shop floor. In specific, the proposed approach iteratively controls the timing of discrete-events occurrence using a control theoretic model. In this approach, changing the speed of the simulation clock, termed time-scaling factor, can accelerate or decelerate the simulation speed resulting in simpler synchronizations of discrete-events and faster simulation than standard distributed discrete-event simulations according to the capability of the communication networks. Computational experiments are conducted to test the performance of the proposed system with different values of the time-scaling factor, and the relationship between the system performance and the time-scaling factor is investigated through analysis of the system model. Results obtained from the computational experiments show significant successes in speeding up discrete-event simulations in such a way that the proposed approach can be used for the control of manufacturing shop floors, providing real-time decision supports.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 49, Issue 4, December 2005, Pages 572-590
Journal: Computers & Industrial Engineering - Volume 49, Issue 4, December 2005, Pages 572-590
نویسندگان
Sohyung Cho,