کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1133606 1489083 2015 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Project scheduling under partially renewable resources and resource consumption during setup operations
ترجمه فارسی عنوان
برنامه ریزی پروژه با استفاده از منابع تجدیدپذیر و مصرف منابع در طول عملیات راه اندازی
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
چکیده انگلیسی


• A RCPSP formulation that can deal with realistic energy constraints is proposed.
• An integer program and a constraint program of the RCPSP are presented.
• A method to restrict selectable modes is proposed.
• Results of computation evaluation reveal show effectiveness of the proposed method.

There has been an increasing pressure on manufacturing industries to reduce energy consumption. In this study, we propose a new variant of RCPSP called RCPSP/πRC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during setup operations. First, we present an integer programming (IP) model and a constraint programming (CP) model of the RCPSP/πRC. Next, we present a heuristic mode restriction method called a mask calculation algorithm to achieve efficient searching by restricting selectable modes. Finally, through computational experiments, we evaluate the proposed methods and show their effectiveness.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 83, May 2015, Pages 91–99
نویسندگان
, , , , , ,