کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1133754 1489087 2015 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Cost optimization model following extended renewing two-phase warranty
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Cost optimization model following extended renewing two-phase warranty
چکیده انگلیسی


• We consider a two-phase warranty which has been newly proposed by the same authors.
• This paper deals with the optimal post-warranty maintenance policy.
• Optimal post-warranty maintenance period is determined minimizing the cost rate.
• The existence and uniqueness of the optimal value has been proved in this paper.
• Free and pro-rata replacement and minimal repair are considered upon system failure.

In this paper, we study an extended warranty model under which the customer is offered an additional warranty period after the original two-phase warranty expires. Under the original two-phase warranty, the warranty period is divided into two non-overlapping subintervals, one of which is for replacement warranty, and the other is for minimal repair warranty. If the system failure occurs during the original warranty period, the failed system is either replaced or minimally repaired by the manufacturer, and if the failure occurs during the extended warranty period, only the minimal repair is conducted. For the system failure during the replacement warranty period, the failed system is replaced by a new one, and the warranty term is renewed anew. Following the expiration of extended warranty, the customer is solely responsible for maintaining the system for a fixed length of time period and replaces the system at the end of such a maintenance period. During the maintenance period, only the minimal repair is given for each system failure. Such a maintenance model can be considered as a generalization of several existing maintenance models which can be obtained as special cases. The main purpose of this article is to determine, from the customer’s perspective, the optimal length of maintenance period after the extended warranty expires. As the criterion to determine the optimal replacement strategy, we adopt the expected cost rate per unit time during the life cycle of the system. Given the cost structures incurred during the life cycle of the system, we formulate the expected cost and the expected length of life cycle to obtain the expected cost rate. The uniqueness of optimal solution for the decision variable is verified when the life distribution of the system shows an increasing failure rate. Numerical examples are provided to illustrate the proposed optimal replacement strategy.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 79, January 2015, Pages 188–194
نویسندگان
, , ,