کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1134134 956056 2013 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Real-time capacity requirement planning for make-to-order manufacturing with variable time-window orders
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Real-time capacity requirement planning for make-to-order manufacturing with variable time-window orders
چکیده انگلیسی

In a make-to-stock (MTS) manufacturing environment using material requirement planning (MRP), checking the capacity feasibility of a master production schedule (MPS) requires capacity requirement planning (CRP) that can be easily calculated. The time window of an order is the time interval from its ready date to its due date. In a make-to-order (MTO) manufacturing environment, the CRP method checks whether a set of orders with different time windows can be scheduled for timely completion. This corporate-level CRP problem has long perplexed MTO contract manufacturers, such as those in the fashion industry. This study therefore develops an efficient and effective CRP approach that considers orders with variable time windows. Real-time capacity feasibility can be checked on both the corporate planning and detailed operational scheduling levels by applying the preemptive earliest due date (PEDD) rule to a single machine problem. This simple and efficient dispatching rule can assess the impact on capacity consumption each time an inquiry order is received or select a set of pre-prioritized orders that can be feasibly scheduled. The efficiency of a supply chain network is affected by its overall lead time, which includes time spent on order processing, manufacturing, and transportation. The proposed approach significantly reduces the order processing time and enhances supply chain efficiency.


► Make-to-order factories check capacity feasibility for variable-time windows orders.
► Capacity requirement planning is developed for make-to-order manufacturing.
► A dispatching rule checks feasibility for both corporate and operational levels.
► The real-time approach is applied to assess capacity when an order inquiry arrives.
► Order selection problems can also be solved efficiently by the proposed approach.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 64, Issue 2, February 2013, Pages 641–652
نویسندگان
, , ,