کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1134143 956056 2013 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders
چکیده انگلیسی

This paper revisits the work by Cárdenas-Barrón (Cárdenas-Barrón, L. E., (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57(3), 1105–1113). The optimal solution condition is analyzed using the production time and the time to eliminate backorders as decision variables instead of the classical decisions variables of lot and backorder quantities. This new approach leads to an alternative inventory policy for imperfect quality items when the optimal production time is less than the optimal time. This is a new method that has not been explored before; it improves and complements the work by Cárdenas-Barrón (2009) and provides interesting managerial insights. An easy to apply solution procedure is provided to obtain the optimal policy. Finally, numerical examples are solved to illustrate our results.


► We use time intervals as decision variables to derive optimal policies.
► We obtain the inventory schedule with feasible optimal intervals.
► A solution procedure to derive the optimal solutions for different cases.
► A numerical example is done to illustrate our results.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 64, Issue 2, February 2013, Pages 748–755
نویسندگان
, , ,