کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1134236 | 956060 | 2013 | 13 صفحه PDF | دانلود رایگان |
This paper investigates an issue of rescheduling on identical parallel machines where the original jobs have already been scheduled to minimize the total completion time, when a single set of jobs to be reworked re-arrives and creates a job rework disruption. Two conflicting rescheduling criteria are considered: the total completion time, as the measure of scheduling cost (efficiency); and the number of jobs assigned to different machines in the original schedule and newly generated schedule, as the measure of disruption cost (stability). Further, the rescheduling problem is defined as a bi-criteria scheduling problem. Two polynomial time algorithms are proposed to lexicographically optimize the two criteria. Besides, the set of all efficient schedules with respect to the two criteria can be also generated in polynomial time.
► The total completion time is used as the efficiency measure.
► Stability of generated reschedules is gauged by the number of disrupted jobs.
► Trade-off between the two criteria is made by both lexicographical and simultaneous approaches.
► All efficient schedules for the two criteria can be generated in polynomial time.
Journal: Computers & Industrial Engineering - Volume 66, Issue 1, September 2013, Pages 186–198