کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1134298 956063 2012 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A network-based approach to the multi-activity combined timetabling and crew scheduling problem: Workforce scheduling for public health policy implementation
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
A network-based approach to the multi-activity combined timetabling and crew scheduling problem: Workforce scheduling for public health policy implementation
چکیده انگلیسی

This paper introduces the multi-activity combined timetabling and crew scheduling problem. The goal of this problem is to schedule the minimum number of workers required in order to successfully visit a set of customers characterized by services needed matched against schedule availability. Two solution strategies are proposed. The first is based on mathematical programming whilst the second uses a heuristic procedure in order to reduce computational time. The proposed model combines timetabling with crew scheduling decisions in one mixed integer programming model which considers multiple activities. The algorithms are tested on randomly generated and real instances provided by the Health to School Initiative, a program based at Bogotá’s local Health Department. The results show that the Initiative can increase its coverage by up to 68% using the proposed heuristic approach as a planning process tool.


► This paper introduces a workforce scheduling problem with customer-oriented services.
► The objective is to minimize the required workers, balance workloads and satisfy demands.
► A network based approach is proposed to model this problem.
► Two different approaches are tested; an exact method and a heuristic approach.
► The approaches are tested on real instances increasing the coverage by up to 68%.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 63, Issue 4, December 2012, Pages 802–812
نویسندگان
, , ,