کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1134629 956074 2011 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Scheduling aircraft landings to balance workload of ground staff
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Scheduling aircraft landings to balance workload of ground staff
چکیده انگلیسی

Scheduling landings of aircrafts is an essential problem which is continuously solved as part of the daily operations of an airport control tower. All planes in the airspace of an airport are to be assigned to landing slots by the responsible air-traffic controller. The support of this decision problem with suited optimization approaches has a long lasting tradition in operations research. However, none of the former approaches investigates the impact of the landing sequence on the workload of ground staff. The paper on hand presents three novel objectives for the aircraft landing problem, which aim at leveling the workload of ground staff by evenly spreading: (1) number of landed passengers, (2) landings per airline, and (3) number of landed passengers per airline over the planning horizon. Mathematical models along with complexity results are developed and exact and heuristic solution procedures are presented.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 60, Issue 2, March 2011, Pages 206–217
نویسندگان
, ,