کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1134781 956078 2011 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A GA/TS algorithm for the stage shop scheduling problem
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
A GA/TS algorithm for the stage shop scheduling problem
چکیده انگلیسی

This paper presents a special case of the general shop called stage shop problem. The stage shop is a more realistic generalization of the mixed shop problem. In the stage shop problem, each job has several stages of operations. In order to solve the stage shop problem with makespan objective function, an existing neighborhood of job shop is used. In this neighborhood, few enhanced conditions are proposed to prevent cycle generation. In addition, a new neighborhood for operations that belong to the same job is presented. These neighborhoods are applied to the stage shop problem in a tabu search framework. A genetic algorithm is used to obtain good initial solutions. An existing lower bound of the job shop is adapted to our problem and the computational results have been compared to it. Our algorithm has reached the optimal solutions for more than half of the problem instances.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 61, Issue 1, August 2011, Pages 161–170
نویسندگان
, ,