کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1134928 | 1489100 | 2011 | 8 صفحه PDF | دانلود رایگان |
Onshore oil wells are dependent of maintenance services such as cleaning, reinstatement and stimulation. These services can be performed by a limited number of workover rigs. Usually, wells need maintenance services and a scheduling of the workover rigs must be defined. This scheduling must consider some factors such as the well production, the type of service to be performed and time windows for the service. There is a production loss associated to wells waiting for maintenance services, so it is important to attend them as soon as possible. Thus, the workover rig scheduling problem consists of finding the best schedule for the limited number of workover rigs, minimizing the production loss associated with the wells waiting for maintenance service. We present a simple and robust Simulated Annealing (SA) algorithm for solving this problem. Computational results on real problems obtained in Brazil are reported and SA presents better solutions than all those approaches reported in the literature.
Research highlights
► In this paper we study the workover rig scheduling (WSR) problem.
► The WSR problem consists in finding routes for workover rigs to serve wells.
► These rigs must serve the wells as soon as possible to reduce the production loss.
► A simple and robust Simulated Annealing (SA) algorithm is proposed for solving it.
► On large instances, our SA outperforms several algorithms proposed to WSR problem.
Journal: Computers & Industrial Engineering - Volume 60, Issue 4, May 2011, Pages 519–526