کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1135770 956114 2011 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A bounded dynamic programming approach to schedule operations in a cross docking platform
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
A bounded dynamic programming approach to schedule operations in a cross docking platform
چکیده انگلیسی

Cross docking is a logistic technique employed to reduce the inventory holding, order picking, transportation costs as well as the delivery time. Products arriving to the cross dock are unloaded from inbound trailers, possibly reconsolidated with other products arriving from different destinations and loaded into outbound trailers within less than 24 h. In this study, we consider a multiple receiving and shipping door cross dock environment. The objective is to find optimal (for reasonably small cross docks) or near optimal (for larger cross docking facilities) scheduling policies which minimizes the total costs related to the transshipment operations at the facility.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 60, Issue 3, April 2011, Pages 385–396
نویسندگان
, , ,