کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1457332 989254 2009 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Evaluation of the short and long-term efficiencies of electro-chemical chloride extraction
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Evaluation of the short and long-term efficiencies of electro-chemical chloride extraction
چکیده انگلیسی

The short and long-term effects of electro-chemical chloride extraction (ECE) treatment on corrosion rate of corroded reinforcement have been studied. The factors controlling ECE treatment were identified, and the alterations which occurred in the chloride profile of the cover zone due to ECE process were followed. Contaminated reinforced OPC and SRC mortar specimens made with 1 or 2% NaCl, by mass of cement, were prepared, cured and then subjected to 3 or 5% NaCl for one year. These specimens were finally treated with ECE using various impressed current densities (1 and 2 A/m2) and electrolytes (water and calcium hydroxide) for 2, 4 and 8 weeks. The state of corrosion was monitored regularly every 2 weeks from halting ECE process up to 52 weeks using zero-resistance ammeter device for measuring the corrosion current density of reinforcement. Selected samples from the cover zone of the untreated and treated specimens were finally taken to assess their chloride profiles.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Cement and Concrete Research - Volume 39, Issue 8, August 2009, Pages 727–732
نویسندگان
, , ,