کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1602362 1515905 2009 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Evaluation of boring machine performance with special reference to geomechanical characteristics
موضوعات مرتبط
مهندسی و علوم پایه مهندسی مواد فلزات و آلیاژها
پیش نمایش صفحه اول مقاله
Evaluation of boring machine performance with special reference to geomechanical characteristics
چکیده انگلیسی
The duration of tunneling projects mostly depends on the performance of boring machines. The performance of boring machines is a function of advance rate, which depends on the machine characterizations and geomechanical properties of rock mass. There were various theoretical and empirical models for estimating the advance rate. In this paper, after determining the geomechanical properties of rock mass encountered in the Isfahan metro tunnel, the performance of the roadheader and tunnel boring machine (TBM) were then evaluated using various models. The calculation results show that the average instantaneous cutting rate of the roadheader in sandstone and shale are 42.8 and 74.5 m3/h respectively. However the actual values in practice are 34.2 and 51.3 m3/h. The operational cutting rate of the roadheader in sandstone and shale are 8.2 and 9.7 m3/h respectively, but the actual values are 6.5 and 6.7 m3/h. The penetration rate of the TBM in shale is predicted to be 50-60 mm/round.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Minerals, Metallurgy and Materials - Volume 16, Issue 6, December 2009, Pages 615-619
نویسندگان
, , ,