کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1628308 1006078 2015 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Optimization and Scheduling of Byproduct Gas System in Steel Plant
ترجمه فارسی عنوان
بهینه سازی و برنامه ریزی سیستم گاز تولیدی در کارخانه فولاد
کلمات کلیدی
صنعت آهن و فولاد، گاز جانبی ذخیره انرژی، بهینه سازی، برنامه ریزی،
موضوعات مرتبط
مهندسی و علوم پایه مهندسی مواد فلزات و آلیاژها
چکیده انگلیسی
A mathematical model was proposed to optimize byproduct gas system and reduce the total cost. The scope and boundaries of the system were also discussed at the same time. Boilers and gasholders were buffer users to solve the fluctuation of byproduct gases. The priority of gasholders should be ranked the last. The allocation of surplus gases among gasholders and boilers was also discussed to make full use of gases and realize zero emission targets. Case study shows that the proposed model made good use of byproduct gases and at least 7.8% operation cost was reduced, compared with real data in iron and steel industry.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Iron and Steel Research, International - Volume 22, Issue 5, May 2015, Pages 408-413
نویسندگان
, , , ,