کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1628406 1006084 2014 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Slag/metal Separation Process of Gas-reduced Oolitic High-phosphorus Iron Ore Fines
ترجمه فارسی عنوان
فرایند جداسازی سرباره / فلزی ضایعات سنگ آهن بالا فسفر اورانیل ضعیف شده
موضوعات مرتبط
مهندسی و علوم پایه مهندسی مواد فلزات و آلیاژها
چکیده انگلیسی

Slag/metal separation process of the highly reduced oolitic high-phosphorus iron ore fines was investigated. Samples were prepared using the reduced ore fines (metallization rate: 88%) and powder additives of CaO and Na2CO3. Slag/metal separation behavior tests were conducted using a quenching method and the obtained metal parts were subjected to direct observation as well as microstructure examination with SEM and EDS; iron recovery and phosphorus distribution tests were conducted using a Si-Mo high temperature furnace and the obtained metal parts were examined by ICP-AES analysis and mass measurement. Thermodynamic calculation using coexistence theory of slag structure was also performed. Results show that temperature for slag/metal separation must be higher than 1823 K and a satisfying slag/metal separation of the highly reduced ore fines needs at least 4 min; phosphorus content of hot metal is mainly determined by thermodynamics; temperature of 1823–1873 K and Na2CO3 mixing ratio of about 3% are adequate for controlling phosphorus content to be less than 0.3 mass% in hot metal; temperature, time and Na2CO3 mixing ratio do not have significant effect on iron recovery, and iron recovery rate could be higher than 80% as long as a good slag/metal separation result is obtained.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Iron and Steel Research, International - Volume 21, Issue 11, November 2014, Pages 1009-1015