کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1628570 1006093 2014 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Practice of Hot Metal Full Pretreatment and Less-slag Steelmaking in ShouGangJingTang
موضوعات مرتبط
مهندسی و علوم پایه مهندسی مواد فلزات و آلیاژها
پیش نمایش صفحه اول مقاله
Practice of Hot Metal Full Pretreatment and Less-slag Steelmaking in ShouGangJingTang
چکیده انگلیسی

The hot metal full pretreatment and less-slag steelmaking process constituted a platform to produce clean steel with low cost and rapid pace and also realized a professional production line. The w[P] can be less than 0.030% at the end of De-P converter and 0.006% at the end of De-C converter. The w[N] in steel can be less than 15×10−6 at the stirring station. This production line can make clean steel steadily used for auto sheet or pipeline, for example X65MS. The De-C slag was left in the converter for the next heat and recycled to De-P converter to reduce lime consumption, which has a great benefit for the cost saving.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Iron and Steel Research, International - Volume 21, Supplement 1, April 2014, Pages 104-107