کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1628872 | 1006109 | 2013 | 5 صفحه PDF | دانلود رایگان |

The burden distribution real-time estimation problem of multi-loop charging based on the real multi-radar data is resolved. Firstly, an iterative algorithm is introduced to calculate the radial coordinate of the pile-top. Then, based on the multi-radar data, the burden profile is estimated by a cubic-curve equation at the end of the multi-loop charging. Furthermore, the burden profile before the next multi-loop charging is calculated based on multi-radar data by considering the impact of burden descent. On the basis of these burden profiles, a more accurate thickness ratio of ore to coke (Ro/c) at the radial direction of blast furnace can be obtained. Finally, an example is given to calculate the burden profiles and Ro/c by using the real multi-radar data sampled from Baosteel, which shows the effectiveness of the method introduced.
Journal: Journal of Iron and Steel Research, International - Volume 20, Issue 6, June 2013, Pages 33-37