کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1722575 | 1014731 | 2011 | 5 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Reduction of stilling basin length with tall end sill
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی دریا (اقیانوس)
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
Experiments were conducted to characterize forced hydraulic jumps in stilling basins for enforced cases due to tail water level or dam site arrangement and construction. The case with a single tall sill was simulated in a horizontal flume downstream of a sluice gate. Results of experiments are compared with the classical hydraulic jump, and significant effect of tall sill on dissipation of energy in shorter distance was confirmed. Furthermore, the generated jumps were classified based on the ratio of sill height to basin length, and a simple design criterion was proposed to estimate the basin length for a desired jump and particular inflow.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Hydrodynamics, Ser. B - Volume 23, Issue 4, August 2011, Pages 498-502
Journal: Journal of Hydrodynamics, Ser. B - Volume 23, Issue 4, August 2011, Pages 498-502