کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1736785 1521527 2015 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
South-eastern Anatolia Project (GAP) factor and energy management in Turkey
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
South-eastern Anatolia Project (GAP) factor and energy management in Turkey
چکیده انگلیسی

Turkey has an adequate amount of water in general, but it is not always in the right place at the right time to meet present and anticipated needs. Turkey has 665.000 ha of inland waters, excluding rivers and small streams. There are 200 natural lakes, with a total area of 500.000 ha, and 775 dam lakes and ponds with a total surface area of 165.000 ha [2,20]. On the other hand, Turkey has made a positive step towards implementing future energy efficiency policies by drafting the Energy Efficiency Strategy Paper, which includes indicative sectoral targets. It was recently conveyed to the prime minister’s office via the Ministry of Energy and Natural Resources (MENR), for formal approval by the High Planning Council (YPK). This paper deals with energy management and Southeastern Anatolia Project (GAP) in Turkey.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Reports - Volume 1, November 2015, Pages 151–155
نویسندگان
,